Example models in detail

Introduction

This section contains a more detailed description of example models found in Predicer. The idea behind the example models is not to provide a detailed and correct ready-to-use model, but rather to explain concepts and ideas found in Predicer, and how it is implemented in the input data files. These concepts and ideas can then be used to build more complex models replicating real systems. It is recommended that this section is read while having the respective example model input data file for reference.

Every aspect of every model is not discussed in detail, if concepts and ideas are described in previous models.

Simple building model

The input data file for the model can be found under "/Predicer/input_data/simple_building_model.xlsx". The simple building model is a model of a simplified building with direct electric heating with spot-based electricity pricing. The energy balance of the modelled building consists of three major elements; heat loss from inside the building to the ambient air, and an electric heater to maintain the temperature of the inside air within a comfortable range. In addition an electric powered domestic hot water (DHW) tank is modelled as a storage, with the use of DHW being represented by a timeseries. The aim of the model is to minimize the electricity costs for the electric heater and the DHW heater by using the storage capacities of the building and the DHW tank to time the use of electricity to the cheapest hours. This should be done while maintaining the temperature of the building at a comfortable level and ensuring that the hot water tank doesn't empty at any point during the day.

A real building could of course be modelled more accurately, adding concepts such as heat losses through ventilation, overall electricity use, effect of solar radiation, dividing the building into smaller nodes, etc.

The model horizon for the simple building model is 9.0 hours with the timesteps being 15 minutes, for a total of 36 timesteps. There are three scenarios in the model (s1, s2 and s3), and all of the data used in the model is randomly generated.

Nodes and processes

The model consists of five nodes: interiorair representing the air (and structures) inside the building, buildingenvelope representing the building components separating the inside from the outside, outsideair representing the ambient air, dhw representing the domestic hot water tank, and elc representing the local electricity grid the building is connected to. npe represents the electricity market from where electricity can be bought for a hourly varying price.

There are two processes in the model: electricheater for converting electricity from the elc node to heat in the interiorair node, and dhw_heater converting electricity from the elc node to heat in the dhw node. Below is a simple schematic of the topology of the simple building model.

flowchart RL
buildingenvelope((buildingenvelope))
npe((npe))
outside((outside))
electricitygrid((electricitygrid))
interiorair((interiorair))
dhw((dhw))
dhw_heater[dhw_heater]
electricheater[electricheater]
electricitygrid_npe_trade_process[electricitygrid_npe_trade_process]
electricitygrid --> electricheater
electricheater --> interiorair
electricitygrid --> dhw_heater
dhw_heater --> dhw
electricitygrid --> electricitygrid_npe_trade_process
electricitygrid_npe_trade_process --> npe
npe --> electricitygrid_npe_trade_process
electricitygrid_npe_trade_process --> electricitygrid
interiorair -.-> buildingenvelope
buildingenvelope -.-> outside

Modelling building heat loss

The building heat loss is modelled as transfer of heat through the buildingenvelope, driven by the temperature difference between the interiorair and the outsideair nodes. The heat loss to the ambient air is modelled using the diffusion functionality found in Predicer. A diffusion flow can be defined between two nodes with states, with the states generally being modelled as temperature instead of energy. The size of the flow between two nodes in a diffusion relation is simply the difference between the states multiplied with a user-defined coefficient c.

Ploss = c * (state1 - state2)

The unit of the heat transfer coefficient c in this model case would be kW/K. The value of the diffusion coefficient is chosen to be 0.25 (kW/K) between the interiorair and buildingenvelope nodes and 0.2 (kW/K) between the buildingenvelope and outside nodes. The diffusion coefficient is provided as a timeseries, and can vary between the timesteps even if in this example it is constant. One use case for a timeseries-dependent diffusion could be a wind forecast, with higher wind speeds resulting in a higher heat loss.

In the example Excel file, this is done on the node_diffusion sheet, where data is defined for each scenario and timestep for both diffusion relations.

t interiorair,buildingenvelope,s1 buildingenvelope,outside,s1
2022-01-05T08:00:00 0.25 0.2
2022-01-05T08:15:00 0.25 0.2

To be able to model heat loss, the buildingenvelope, interiorair and outside nodes are given states which represent the temperature in the respective nodes. This is done by setting the is_state and is_temp flags to True.

Most of the flows in Predicer, such as process flows, diffusion flows, etc. are modelled as energy, not temperature. The conversion between energy and temperature for a state is defined in the T_E_conversion parameter. This parameter indicates how much energy is required to increase the temperature of the state by one (the unit depends on the model, in this case one Kelvin K). In the simple building model the energy is in the form of kW/kWh, and temperature in the form of K. The conversion rate is set to 0.5 (kWh/K) for the interiorair node and 1.0 (kWh/K) for the buildingenvelope node. If the heat losses were zero, this would mean that operating the electric heater at 1 kW for one hour would increase the temperature of the interiorair node by 2 K, which essentially would mean increasing the value of the storage (state) by 2. As the heat losses from the building are not expected to increase the temperature of the ambient air, the T_E_conversion parameter is set to 1 000 000 000 for the outside node. In the simple building model this means, that a cumulative heat flow of 109 kWh into the ambient air node is required to increase its storage state by 1 (K).

The initial states of the interiorair, buildingenvelope and outside nodes are set to 292.15 K, 282.0 K and 269.5 K, respectively. The modelled system is approximately in balance on the first timestep when these values are used.

As the heat loss in this model depends on the temperature difference between the building and the ambient air, it is important to be able to define the ambient air temperature properly. This can be done by setting the is_inflow flag of the outside node to True. This allows the hourly temperature changes of the ambient air to be given as an inflow timeseries to the node. So if the initial ambient temperature would be 263K, and the temperature for three first time steps would be 273K, 268K and 260K, the inflow timeseries to the ambient air node (outside) would be [+10, -5, -8] for the first three timesteps.

As one of the objectives of this example model is to maintain a comfortable temperature inside the building, the boundaries of the comfortable temperature range must be defined. This can either be done using hard or soft boundaries. If hard boundaries are used, the temperature of the interiorair node is not allowed to go below or above the boundaries. This can be achieved either by setting the node parameters state_min and state_max to the desired temperature range, or by making user-defined gen_constraints with the is_setpoint flag set to false.

Soft boundaries for the temperature range can be defined by making user-defined gen_constraints with the is_setpoint flag set to true. When a suitable cost (penalty parameter in the "constraints" sheet in the input data excel file) is set, the model can deviate from the given temperatue range, but this induces a cost for the model and is thus usually avoided. It is also possible to combine several layers of soft boundaries, with the cost of deviation increasing for each passed layer, and hard boundaries with soft boundaries, as long as the hard boundaries are less "strict" than the soft boundaries (e.g. hard boundary lower/upper limits of 15°C/27°C and soft boundery lower/upper limits of 19°C/24°C).

name operator is_setpoint penalty
c_interiorair_up st 1 15
c_interiorair_down gt 1 15

One set of soft boundaries are used in the example model, defined using the "c_interiorair_up" as upper limit and "c_interiorair_down" as lower limit gen_constraints. The operator for the constraints are "st" (smaller than) and "gt" (greater than), meaning that the value of the limited variable should be smaller than and greater than, respectively, than the value of the constraints. The parameter is_setpoint is set to true as this is a setpoint constraint, with the penalty parameter being set to 15 (€/K/h). The penalty is not a real cost, but rather a steering cost for getting the model to behave in an intended manner. The other part of the constraints are defined in the "gen_constraint" sheet in the input data excel. The limiting value for c_interiorair_up is set to 298.15K (25°C), and the limit for c_interiorair_down is 292.15K (19°C).

t c_interiorair_up,interiorair,s1 c_interiorair_down,interiorair,s1
2022-01-05T08:00:00 298,15 292,15
2022-01-05T08:15:00 298,15 292,15
... ... ...

The state_min and state_max parameters for the interiorair, buildingenvelope and outside nodes are set to values that are outside the the system is expected to reach. As the inside temperature range is between 292K-298K, a suitable range for the interiorair state is 273K to 308K. For the outside and buildingenvelope nodes a minimum and maximum values for the states are chosen to be 238K and 308K.

Modelling the domestic hot water system

The idea behind modelling the DHW system is to use the DHW tank as a storage, to time the use of electricity to prepare the hot water to the time when the price of electricity is the lowest. This has to be done, while ensuring that the DHW never runs out. The storage is allowed to be empty momentarily, as long as there is enough to cover the demand at all times.

The DHW system is modelled using a node dhw with a state (storage) and inflow (hot water use timeseries). The unit in dhw is thought to be kWh, to make it easier to model in this case. This means that the "water" in the DHW tank is represented by the amount of energy it would require to heat it from cold water, and the limits of the storage, as well as the inflow (use) of DHW uses this same unit. The storage losses of the DHW tank are not accounted for, as it is assumed that the heat is dissipated into the building, thus reducing the need to operate the electric space heater. The state_loss-proportional parameter is thus set to 0.

The inflow data for the DHW system is randomly generated, with a small baseload and one or more larger spikes, representing 5-15 minute showers. The DHW demand can either be covered directly using the dhw heater, or by taking water from the hot water tank. The DHW demand is between 15 - 22 kWh over the modelled 9 hours, with the largest peak being 9.17 kWh over an timestep. This means that the dhw_heater (3 kW) is not enough to cover the demand at all timesteps.

As Predicer doesn't consider what happens before or after the modelled time horizon, it is likely that the DHW tank would be empty after the last timestep, since any water left in the tank would be "wasted" from the perspective of the model. To amend this, a value for the water remaining in the tank can be defined. This value estimate is set to be the average hourly electricity price of the simple building model. This parameter is defined using the state_residual_value field in the input_data file on the nodes sheet.

Simple district heating system model

The input data file for the model can be found under "/Predicer/input_data/simple_dh_model.xlsx". The simple district heating model is a model of a simple district heating system, operated by a single actor. The idea behind the system is to minimize the costs (or maximize the profits) while covering an hourly heat demand, and operating on an electricity spot market. The heat demand is defined as a time series, and the system has to cover the demand at all times. Several different heat generation units in combination with a heat day storage provides flexibility, which can be utilized to minimize the costs of covering the demand. The price of the provided heat is not defined (also 0), as is usual for local DH system modelling. The costs of the modelled system thus consist of fuel and operational costs for generating the required heat, and profits come from electricity sold to the spot market.

The model only considers heat balances on a system production level, and building-specific balances are not considered. DH pressures, temperatures, losses, etc. are also not considered in the model. The modelled system is fictional, and the data used in the model is either fictional and/or randomly generated.

Nodes and processes

The modelled system consists of five nodes: ng representing a natural gas grid from where natural gas can be bought for a fixed price, elc representing a local electricity grid, heat representing a district heating grid, hp_source representing a natural heat source, such as seawater, and npe representing an electricity spot market where electticity can be bopught and sold for an hourly price. Additionally the node heat_storage represents a thermal energy storage connected to the district heating system.

There are several process for generating heat in the system; elc_boiler converting electricity directly to heat, heat_pump_1 converting electricity and low-temperature heat from the hp_source node to heat in the heat node with a variable capacity, heat_pump_2 converting electricity to heat in the heat node with a variable efficiency, solar_collector producing heat based on a capacity factor time series, and ngchp representing a combined heat and power plant converting natural gas from the ng node to electricity and heat at a fixed ratio. Additionally, there is a process heat_sto_charge for transferring heat from the heat node to the heat_storage and heat_sto_discharge for transferring heat from the heat_storage to the heat node. The process elc_npe_trade_process is used to buy and sell electricity from the electricity spot market npe.

Below is a simple flowchart of the modelled system, showing the connections between the nodes and processes in the modelled system.

flowchart TD
npe((npe))
heat((heat))
ng((ng))
hp_source((hp_source))
heat_storage((heat_storage))
elc((elc))
elc_boiler[elc_boiler]
solar_collector[solar_collector]
elc_npe_trade_process[elc_npe_trade_process]
ngchp[ngchp]
heat_sto_charge[heat_sto_charge]
heat_pump_1[heat_pump_1]
heat_pump_2[heat_pump_2]
heat_sto_discharge[heat_sto_discharge]
ng --> ngchp
ngchp --> elc
ngchp --> heat
hp_source --> heat_pump_1
elc --> heat_pump_1
heat_pump_1 --> heat
elc --> heat_pump_2
heat_pump_2 --> heat
heat --> heat_sto_charge
heat_sto_charge --> heat_storage
heat_storage --> heat_sto_discharge
heat_sto_discharge --> heat
elc --> elc_boiler
elc_boiler --> heat
solar_collector --> heat
elc --> elc_npe_trade_process
elc_npe_trade_process --> npe
npe --> elc_npe_trade_process
elc_npe_trade_process --> elc

In the model there are various costs linked to power and heat generation which should be taken into consideration. These costs include fuel costs (natural gas, electricity), electricity transmission costs, carbon emission permits, as well as emission taxes for carbon and electricity. The fuel cost of natural gas is defined as a timeseries on the price sheet in the input data, with a value of 25.0 (€/MWh) for every hour. The cost of electricity, both when buying and selling is defined as a timeseries in the market_prices sheet in the input data. The prices are randomly generated, and vary between 2.13-85.38 (€/MWh), with an average price of 42.92 (€/MWh).

The sum of the carbon emission permits and carbon tax amount to 22.0 () per MWh of natural gas used. As these costs depend on the use of natural gas from the ng node, the VOM (variable operation and maintenance) cost of the natural gas flow for the ngchp process in the process_topologies sheet is set to 22.0. This causes a cost of 22.0 for each unit (MWh) of ng that is used by the ngchp process. In this example model case these costs could also have been directly added to the price of natural gas, as the ngchp process is the sole consumer of natural gas. Another way to implement carbon permits or taxes (€/ton) would be to add a "emissions" flow to relevant processes and to add the costs to the VOM of this flow. To ensure this works properly, a gen_constraint has to be created to fix the size of the emission flow proportional to the size of the natural gas flow into the process. Additionally, the efficiency of the process has to be adjusted to include the emissions. A third way would be to create a commodity node carbon_permits_and_taxes, from where there would be a flow to a process using natural gas. In this case a gen_constraint fixing the ratio between natural gas and "emissions" would be needed as well. The emission costs can be set as the price of the commodity node.

The sum of electricity tax and distribution costs is assumed to be 15.0 (€/MWh), and is added to each topology where electricity is consumed, except when buying from the market node. In this model this means the elc flows of the heat pumps and the elc flow of the elc_boiler. A summary of the relevant production costs for processes and flows is visualized in the table below.

Process flow Fuel costs Taxes + Carbon permits
ngchp, ng 25.0 22.0
ngchp, elc 0.0 0.0
ngchp, heat 0.0 0.0
heat_pump_1, elc 2.13 - 85.38 15.0
heat_pump_1, hp_source 0.0 0.0
heat_pump_1, heat 0.0 0.0
heat_pump_2, elc 2.13 - 85.38 15.0
heat_pump_2, heat 0.0 0.0
heat_sto_charge, heat 0.0 0.0
heat_sto_charge, heat_storage 0.0 0.0
heat_sto_discharge, heat_storage 0.0 0.0
heat_sto_discharge, heat 0.0 0.0
solar_collector, heat 0.0 0.0
elc_boiler, elc 2.13 - 85.38 15.0
elc_boiler, heat 0.0 0.0

Scenario and market definition

Scenarios in Predicer are user-defined possible futures the system and environment around the system can take, with different values for forecasted values, such as prices, weather, supply and demand, etc., but different scenarios can have identical values in one or several timesteps as well. These scenarios are separate from each other, with for example the weather forecast (solar/wind production, heat demand, etc.) ideally correlating with market price forecasts within the same scenario. In this model there are three scenarios: s1, s2 and s3. The scenarios are defined on the scenarios sheet in the input data file. The probability of these scenarios is 0.3, 0.4 and 0.3, respectively, and is used for weighting the scenario properly in the optimization.

scenario probability
s1 0.3
s2 0.4
s3 0.3

This example model has one defined market, npe which represents an electricity spot market where electricity can be bought and sold for prices and volumes that are determined the day before. Running Predicer produces a bidding curve for each defined market. This bidding curve consists of a group of price-volume pairs, and essentially indicates how much should be bought or sold from a market, if the price were x. The market prices for different scenarios for each timestep is used as a basis for the bidding curves. This means, that the price points for a specific hour on the bidding curve are defined using the market prices in the different scenarios. As a result, the number of price points on the bidding curves depends on the number of scenarios, and if the scenarios have unique values or not.

The market npe is defined on the markets sheet in the input data file. The type parameter is defined to "energy" (as oppposed to "reserve" for reserve markets), and the linked node is elc. The parameters processgroup, direction, realisation and reserve_type are only used for reserve markets, and have been given filler values in this example. The market npe has a bidding functionality, but is not limited. The parameter is_bid is thus set to true, while the parameters is_limited, min_bid and max_bid are set to zero. There is no fee for bidding, so fee is also set to zero.

market type node processgroup direction realisation reserve_type is_bid is_limited min_bid max_bid fee
npe energy elc p1 none 0 none 1 0 0 0 0

The price forecasts for the markets in the model are defined on the market_prices sheet in the input data file. These are in the form of timeseries, defined for every scenario, for every market. A part of the market_prices table is visualized below. When an energy market is defined, the balance markets npe_up and npe_down are automatically created. The model can buy (up) or sell (down) from these markets to adjust the system energy balance if needed.

t npe,s1 npe,s2 npe,s3
16.4.2024 0:00 16,43 24,25 17,77
16.4.2024 1:00 7,65 22,58 19,13
16.4.2024 2:00 2,13 24,53 20,42
... ... ... ...

The prices for the balance markets are defined in the balance_prices sheet in the input data file. As the user-defined market npe and the balance markets npe_up and npe_down are connected to the same node (elc), the model can buy from one market and sell to the other. This causes the model to be unbounded unless buying from one market and selling to another is disadvantageous. In this example this is done by setting the price of npe_up to 0.01 more than the price for npe, and *npe_down to 0.01 less than the corresponding price given for npe. Parts of the table defined in the balance_prices sheet is visualized below.

t npe,up,s1 npe,up,s2 npe,up,s3 npe,dw,s1 npe,dw,s2 npe,dw,s3
16.4.2024 0:00 16,44 24,26 17,78 16,42 24,24 17,76
16.4.2024 1:00 7,66 22,59 19,14 7,64 22,57 19,12
16.4.2024 2:00 2,14 24,54 20,43 2,12 24,52 20,41
... ... ... ... ... ... ...

Modelling the CHP unit

The combined heat and power process ngchp converts natural gas from the ng node to electricity to the elc node and heat to the heat node. In reality a natural gas-based CHP plant would consist of a steam boiler, steam turbine, turbine bypass, etc. In this case the whole plant is modelled as a single process with fuel in to the process and electricity and heat out of the process. The heat rate of the process is set to be constant at all loads, with the amount of generated heat being 3 times the amount of generated electricity. The process ngchp is modelled with the ng flow in and with the elc and heat flows out. So called user constraints, or in Predicer terms gen_constraints, are used to define the heat rate. Without user constraints Predicer would be able to adjust the electric and heat flows freely, as long as efficiency, online and capacity boundaries are fulfilled.

The user constraints are defined in the constraint and gen_constraint sheets in the input data file. The name, type and operator of the constraint is defined on the constraint sheet. The user constraint ngchp_c1 has the operator eq, meaning "equal", and it is not a setpoint constraint. How the constraint ngchp_c1 is defined on the constraint sheet is shown in the table below.

name operator is_setpoint penalty
ngchp_c1 eq 0 0

User constraints consist of a sum of variables multiplied with coefficients, being set equal to a constant. The names, types and coefficients of the variables limited by the user constraints are defined on on the gen_constraint sheet. In this example case the heat flow variable should be set to be three times larger than the electricity flow variable, which can be written as:

v_flow[heat] = 3 * v_flow[elc]

Which can be written as

v_flow[heat] - 3 * v_flow[elc] = 0

The coefficients for the heat and electricity flow variables should thus be 1 and -2, respecitvely, and the constant should be zero. Below is a part of the gen_constraints sheet table, where the variables, coefficients and constant are defined. The types of the variables depends on the column names, and in the case of flow variables is of the form constraint_name,process,flow,scenario. As such the column names are "ngchp_c1,ngchp,elc,s1" and "ngchp_c1,ngchp,heat,s1". Additionally, the constant value of the constraint is required, and is defined with a column namenotation of constraint_name,scenario. As the heat rate is constant, and same in all scenarios, the values must be defined for every timestep in all scenarios.

t ngchp_c1,ngchp,elc,s1 ngchp_c1,ngchp,heat,s1 ngchp_c1,s1
16.4.2024 0:00 -2 1 0
16.4.2024 1:00 -2 1 0
... ... ... ...

In this model the heat rate is set to a constant value, but it would be possible to have a varying heat rate. This could be done by making two user constraints, one defining the lower bound of the electricity-heat ratio, and one defining the upper bound of the ratio. Assuming the heat output should be between 2.5 and 3.5 times the electrical output, the constraint could be formulated as:

v_flow[heat] >= 1.5 * v_flow[elc]

v_flow[heat] <= 2.5 * v_flow[elc]

Which can be written as

v_flow[heat] - 1.5 * v_flow[elc] >= 0

v_flow[heat] - 2.5 * v_flow[elc] <= 0

Modelling the heat pumps

There are two heat pump processes, heat_pump_1 and heat_pump_2, in this example model. Both of these processes convert electricity from the elc node to heat in the heat node. Additionally heat_pump_1 is connected to the commodity node hp_source, from where lower-grade heat can be obtained from free, but at a limited availability. The coefficient of power (COP) of a heat pump depends on many factors, one of which is the temperature of the used heat source. As the temperature (and thus COP) and availability of some natural heat sources typically fluctuate between seasons or even days, the operational limits of heat pump can be defined using timeseries. In this example there are two heat pumps with similar parameters (capacity, cost, etc). The operation of the heat pumps is affected by the price of electricity, the efficiency, and the amount of heat available from the node hp_source. The heat production of heat_pump_1 is limited by the availability of heat from the hp_source node, while the production for the process heat_pump_2 depends on a timeseries-dependent efficiency.

The amount of heat from the hp_source available to the heat_pump_1 process is limited with a timeseries, setting an upper limit for the flow between the hp_source node and the heat_pump_1 process. This timeseries is defined on the cap_ts sheet in the example input data. Below is a part of the table found in the cap_ts sheet in the input data file. It is assumed, that the efficiency of heat_pump_1 is constant at 2.0, meaning ½ of the generated heat comes from the electricity, and ½ comes from the heat source. A value of 1,57 (MW) for available heat would mean, that the amount of electricity is equal (1.57 MW) and the total heat output would be 3.14 MW.

t heat_pump,hp_source,s1 heat_pump,hp_source,s2 heat_pump,hp_source,s3
16.4.2024 0:00 1,57 2,35 2,50
16.4.2024 1:00 1,62 2,45 2,55
16.4.2024 2:00 1,62 2,55 2,45
... ... ... ...

Like the ngchp process, the ratio of the incoming flows should be fixed. This ratio is fixed using the user constraints, like the ngchp process. The coefficients for the variables should be -1.0 and 1.0, with the constant being 0.0.

t hp1_c1,heat_pump_1,elc,s1 hp1_c1,heat_pump_1,hp_source,s1 hp1_c1,s1
16.4.2024 0:00 -1 1 0
16.4.2024 1:00 -1 1 0
16.4.2024 2:00 -1 1 0
... ... ... ...

The efficiency timeseries for the heat_pump_2 process is defined on the eff_ts sheet in the input data. The given timeseries limits the total efficiency of the process for every timestep, meaning flows_in * eff = flows_out. The heatpump has one flow in (elc) and one flow out (heat). Below is a part of the defined data in the eff_ts sheet in the input data file. An efficiency of 1.95 would in the case of the heat_pump_2 process mean that the amount of heat provided to the heat node at time t is 1.95 times the electric power of the heat pump at time t, meaning 1.0 MW of electricity and 0.95 MW of heat (not modelled for heat_pump_2) would be required for a heat output of 1.95 MW. Because there is only one flow in and one flow out, there is no need to create gen_constraints for heat_pump_2.

t heat_pump_2,s1 heat_pump_2,s2 heat_pump_2,s3
16.4.2024 0:00 1,95 2,1 1,75
16.4.2024 1:00 1,83 2,04 1,64
16.4.2024 2:00 1,93 2,14 1,57
... ... ... ...

Modelling the solar collector

The solar collector process solar_collector in this model is modelled as a capacity factor (cf) process. In contrast to other process types, cf processes do not have a source node going into the process. Instead, the process is modelled using a capacity factor timeseries. This means that the process has a maximum output, and a hourly capacity factor (cf) timeseries defining what percentage of this output can be used. This cf timeseries is defined on the cg sheet in the input data file.

t solar_collector,s1 solar_collector,s2 solar_collector,s3
16.4.2024 0:00 1 0,63 0,02
16.4.2024 1:00 0,96 0,56 0,0
16.4.2024 2:00 0,97 0,55 0,09
... ... ... ...

The maximum capacity of the solar collector is set to 3.0 (MW). The is_fixed flag in the processes sheet is set to false, meaning that the cf timeseries sets an upper limit for the production of the cf process. If is_fixed would be set to true, then the output of the process would be fixed by the capacity factor timeseries.

In this example this means, that if the value capacity factor timeseries value for a certain hour would be 1, then the output of the solar_collector process would be between 0.0 (MW) and 3.0 (MW). If the cf value would be 0.3, the output would be 0-0.9 (MW).

Modelling the heat storage

The simple district heating model contains a daily heat storage, which can be used to balance the system and offer flexibility between hours. The storage is defined in the node heat_storage, and it is connected to the heat node via the processes heat_sto_charge and heat_sto_discharge. The capacity of the storage is set to 10.0 (MWh), with the maximum flows in and out of the storage each being 3.0 (MW). As the system heat demand varies between 7-15 (MW), the storage alone cannot be used to generate heat into the system. The storage losses are 0.001 of the storage value per hour, and the starting value of the storage is set to 0.0.

Optimization models commonly empty storages by the end of the model horizon, as any storage content is "wasted" from the model perspective. To prevent this, a value for heat remaining in the storage at the end of the model horizon is defined. The chosen value should represent the expected costs of heat production in the "next" horizon.

Two stage model

The two stage dh model is an extension of the simple district heating model described above. The model is defined in the "two_stage_dh_model.xlsx" input data file. The extension consists of a simple two stage modelling implementation, with a first stage where the price of the market npe and all other timeseries parameters are known and identical for all scenarios (s1, s2, s3). After the common start, the scenarios branch out into separate forecasts in the second stage. The lengths of the first and second stages are 12 timesteps (12 hours) each. The two stage approach is defined in the setup sheet, with setting the common_timesteps parameter to 12, and the common_scenario_name parameter to "ALL". This leads to all variable indices to have the scenario name ALL for the first 12 timesteps, instead of the standard scenario names.

All of the scenario-dependent timeseries parameters are set to be identical between the scenarios for each timestep for the first 12 timesteps. In this case this means the inflow, cf, (price), market_prices, balance_prices, eff_ts, cap_ts, and constraint timeseries. After the model has been optimized, the values for the variables for the first 12 timesteps are the same in all scenarios, after which they start to branch out.

Simple hydropower river system

The input data file for the example model can be found under "simple_hydropower_river_system.xlsx". This example model consists of a hydropower river system with five hydropower plants connected by a river. Each hydropower plant contains a reservoir, where water can be stored for optimal use timing. Each reservoir has a inflow of water from smaller rivers or rainfall Each hydropower plant also contains a turbine by-pass, which can be used to release water from the reservoir to the river without producing electricity. The model contains a delay between the hydropower plant, meaning it takes a while for the released water to reach the next plant.

The goal of the model is to maimize the profits on the linked electricity markets by optimizing the use of the water in the reservoirs as well as possible. The system is constrained by minimum and maximum flow requirements for the river, as well as minimum and maximum water levels in the reservoirs. The model contains three scenarios "dry", "normal" and "wet", with differing electricity market prices and inflow to the reservoirs. The scenario "dry" contains a lower inflow into the reservoirs and resulting higher electricity prices. The scenario "wet" containts a higher inflow into the reservoirs and lower electricity prices, while the scenario "medium" lies somewhere in between "dry" and *"wet"*in regards to inflow and electricity prices.

The depicted system is fictional, and all timeseries data (inflows, market prices, etc.) is randomly generated, with some modifications. The time horizon for the model is 30 days, with the first two days being modelled in higher resolution with one hour timesteps, the following two days modelled with 4 hour timesteps, and the rest being modelled with one day timesteps.

Nodes and processes

There are five hydropower plants (processes) in the model hydro1, hydro2, hydro3, hydro4 and hydro5, representing hydropower turbines. All of these processes have a linked node; res1, res2, res3, res4 and res5, respectively. Each plant also has a linked spill process hydro1_spill, hydro2_spill, hydro3_spill, hydro4_spill, and hydro5_spill, which can be used to release water from the linked reservoir without producing electricity. A simple schematic of the river system can be seen in the figure below. The reservoirs linked to the processes hydro1 and hydro2 do not have an "upstream" connection, and the processes both connect with the reservoir linked with hydro3. The process hydro3 is upstream of hydro4, which is upstream of hydro5. The process hydro5 doesn't have a downstream node, and it could be thought that this is where the river system flows out to the sea. The modellled system also has an electricity node elc, which is linked to electricity energy and reserve markets. Each of the hydropower plants has a connection to the elc node.

flowchart TD

The reservoir nodes (both inflows and flows) are modelled as water (m3). As the flows are large, the unit of one water is assumed to be 1000 m3 instead of 1 m3. This reduces scaling issues in the model as well. The amount of energy available in the water can be calculated using the potential energy of the water, and assuming some losses in the conversion process. The process electrical generation ber unit of water (1000 m3), the corresponding process (electrical) efficiency p, as well as reservoir and flow limitations are shown in the table below. All the water-related numbers are per 1000 m3.

Process Elc per water Efficiency Reservoir max Reservoir min Min flow Max flow
hydro1 0.0818 MWh 0.073 2000 800 40 300
hydro2 0.1227 MWh 0.110 2000 800 40 300
hydro3 0.1092 MWh 0.098 2000 800 40 300
hydro4 0.0956 MWh 0.086 2000 800 40 300
hydro5 0.0437 MWh 0.039 2000 800 40 300
  • river inflow
  • delays
  • reservoirs, spill, etc

Large convenience store

  • Heat pumps
  • Solar panels
  • Cold shelves as storage, building as storage
  • Either DH or local heat source (GSHP?)
  • Solar panels/collectors

Simple hydropower river system

  • Delay between plants?
  • Variable time control?

Electric storage producing reserve

  • Solar cells + storage acting on spot + some reserve market.

Rolling model

  • Rolling model for one year.